Events

Factors influencing the planning of electrolysis plants

Factors influencing the planning of electrolysis plantsSource: Hydrogen Alliance

Factors influencing the planning of electrolysis plants

17. November 2022

Veranstalter: Wasserstoff-Allianz Südniedersachsen - H2AS

H2AS lecture series: "Influencing factors in the planning of electrolysis plants".

The Hydrogen Alliance South Lower Saxony (H2AS) invites all interested parties to the 7th online meeting of the H2AS lecture series on Thursday, November 17, 2022 (17:30-18:30). The topic of the seventh meeting is "Influencing factors in the planning of electrolysis plants".

Contents

Medium-scale green hydrogen production and distribution plants add value through increased self-sufficiency, local optimization, and security of energy and hydrogen demand. In addition to the widely heralded large electrolysis plants over 100 MW, these distributed plants are THE cornerstone of the broad-scale hydrogen infrastructure. These plants with a production rate up to 5 t/d are based on standard components, are configured according to customer needs and can be invested "turnkey - ready to use". In this presentation, Christian Perplies (FEST GmbH) discusses the influencing factors necessary for the plant design. The resulting plant concept is the basis for a solid business case evaluation and a prerequisite for the realization of the investment project.

Registration

The free event will take place online via the web conferencing tool "Zoom". Anyone interested can register here using the registration form.

If you have any further questions, please do not hesitate to contact Dr. Peter Oswald by phone on 0151/42062472 or by email at peter.oswald@suedniedersachsenstiftung.de.